← Return to previous page

FEIS Errata

2.0 Summary of Changes

2.1 Project Master Plan

2.2 Project Master Plan – Constraints

2.3 Project Master Plan with Constraints Enlargements

2.4 Lot Study Plan

2.5 DEIS Master Plan Modifications Plans

2.6 Lot Summary Table

2.7 Letter Report – Stormwater

2.8 Letter Report – Water

2.9 Letter Report – Wastewater

2.10 Letter Report – Traffic

2.11 Letter Report – Socioeconomics

2.12 Revised ARB Guidelines

2.13 Surveyor Stamped Watercourses

2.14 Micropool Extended Detention Pond Summary Table

2.15 Revised Blasting Mitigation Measures

2.16 Alternative Access Analysis

2.17 HydroCAD Links for Residential Units

2.18 Modified Stormwater Management Design Report

2.19 Comparison of Pre and Post Rates Table

2.20 HydroCAD Data Files Using Synthetic Rainfall Values

2.21 Alpha Geo Evaluation

2.22 Erosion and Sediment Control Design for Single Family Lots

2.23 Impervious Area Summary Chart

2.24 Updated TP and TSS Loading Estimates

2.25 Floristic Survey Route

2.26 Isolated Wetlands

2.27 Isolated Wetland Disturbance

2.28 Wetland Data Points